The excess under excavation control of tunnel drill-andblast excavation method

LI Tong-qin

Open publisher page 0 citations

Abstract

The excess under excavation reasons of tunnel drill-and-blast excavation were illustrated.The influencing of tunnel drill-andblast excavation on the tunnel construction cost and construction procedure were analyzed,the principal methods to control excess under excavation were proposed.It pointed that the last efficiency could be obtained only make construction technology management,construction field management and construction resources disposal on the controllable situation.

About this research paper

What this paper is about

The excess under excavation reasons of tunnel drill-and-blast excavation were illustrated.The influencing of tunnel drill-andblast excavation on the tunnel construction cost and construction procedure were analyzed,the principal methods to control excess under excavation were proposed.It pointed that the last efficiency could be obtained only make construction technology management,construction field management and construction resources disposal on the controllable situation.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The excess under excavation reasons of tunnel drill-and-blast excavation were illustrated.The influencing of tunnel drill-andblast excavation on the tunnel construction cost and construction procedure were analyzed,the principal methods to control excess under excavation were proposed.It pointed that the last efficiency could be obtained only make construction technology management,construction field management and construction resources disposal on the controllable situation.

Key concepts: Excavation, Drill, Engineering, Tunnel construction, Principal (computer security), Geotechnical engineering, Mining engineering, Mechanical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
The excess under excavation control of tunnel drill-andblast excavation method — Research Paper | ScholarLens