MASS CONCRETE CONSTRUCTION IN A HIGH TEMPERATURE DESERT REGION
Xiang Cha
Abstract
Xiang Cha
Abstract
During a mass concrete construction of the Ketumu Petroleum Plant Project,there are a number of improvement technology measures adopted namely:1,advancement of foundation restraint conditions 2,reduction of concrete hydration heat 3,control of concrete temperature in form-work 4,comprehensiveness of temperature differences 5,strengthening of concrete temperature investigation and 6,carrying out a completely practical construction measure,therefore,a mass concrete pouring operation could be surely guaranteed to its best advantage.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
During a mass concrete construction of the Ketumu Petroleum Plant Project,there are a number of improvement technology measures adopted namely:1,advancement of foundation restraint conditions 2,reduction of concrete hydration heat 3,control of concrete temperature in form-work 4,comprehensiveness of temperature differences 5,strengthening of concrete temperature investigation and 6,carrying out a completely practical construction measure,therefore,a mass concrete pouring operation could be surely guaranteed to its best advantage.
Key concepts: Mass concrete, Foundation (evidence), Work (physics), Measure (data warehouse), Temperature control, Civil engineering, Engineering, Environmental science