Feasibility analysis on upward mining in first mining area of Jike coal mine
Sihua Zhang
Abstract
Sihua Zhang
Abstract
Based on method of theory analysis and numerical simulation,feasibility analysis on upward mining on NO.M11 coal seam in the first mining area of Jike colliery in Yunnan province was studied.The results showed that the height of caving zone after mining is 8.47 meters,and height of fracture zone is 21.1~32.4 meters,the M9 coal seam is in the fracture zone of M11 coal seam after mining.Numerical simulation results indicated that the vertical stress in M9 coal seam is obviously reduced.The maximum height of fracture zone is 26 meters.And the relief effect is significant.It is feasible to make M11 coal seam as the operation layer for M9 coal seam.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Based on method of theory analysis and numerical simulation,feasibility analysis on upward mining on NO.M11 coal seam in the first mining area of Jike colliery in Yunnan province was studied.The results showed that the height of caving zone after mining is 8.47 meters,and height of fracture zone is 21.1~32.4 meters,the M9 coal seam is in the fracture zone of M11 coal seam after mining.Numerical simulation results indicated that the vertical stress in M9 coal seam is obviously reduced.The maximum height of fracture zone is 26 meters.And the relief effect is significant.It is feasible to make M11 coal seam as the operation layer for M9 coal seam.
Key concepts: Coal mining, Mining engineering, Problems in coal mining, Coal, Fracture (geology), Geology, Fracture zone, Geotechnical engineering