2012Journal of Hebei University of EngineeringRequires access

Feasibility analysis on upward mining in first mining area of Jike coal mine

Sihua Zhang

Open publisher page 0 citations

Abstract

Based on method of theory analysis and numerical simulation,feasibility analysis on upward mining on NO.M11 coal seam in the first mining area of Jike colliery in Yunnan province was studied.The results showed that the height of caving zone after mining is 8.47 meters,and height of fracture zone is 21.1~32.4 meters,the M9 coal seam is in the fracture zone of M11 coal seam after mining.Numerical simulation results indicated that the vertical stress in M9 coal seam is obviously reduced.The maximum height of fracture zone is 26 meters.And the relief effect is significant.It is feasible to make M11 coal seam as the operation layer for M9 coal seam.

About this research paper

What this paper is about

Based on method of theory analysis and numerical simulation,feasibility analysis on upward mining on NO.M11 coal seam in the first mining area of Jike colliery in Yunnan province was studied.The results showed that the height of caving zone after mining is 8.47 meters,and height of fracture zone is 21.1~32.4 meters,the M9 coal seam is in the fracture zone of M11 coal seam after mining.Numerical simulation results indicated that the vertical stress in M9 coal seam is obviously reduced.The maximum height of fracture zone is 26 meters.And the relief effect is significant.It is feasible to make M11 coal seam as the operation layer for M9 coal seam.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Based on method of theory analysis and numerical simulation,feasibility analysis on upward mining on NO.M11 coal seam in the first mining area of Jike colliery in Yunnan province was studied.The results showed that the height of caving zone after mining is 8.47 meters,and height of fracture zone is 21.1~32.4 meters,the M9 coal seam is in the fracture zone of M11 coal seam after mining.Numerical simulation results indicated that the vertical stress in M9 coal seam is obviously reduced.The maximum height of fracture zone is 26 meters.And the relief effect is significant.It is feasible to make M11 coal seam as the operation layer for M9 coal seam.

Key concepts: Coal mining, Mining engineering, Problems in coal mining, Coal, Fracture (geology), Geology, Fracture zone, Geotechnical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Feasibility analysis on upward mining in first mining area of Jike coal mine — Research Paper | ScholarLens