Establishing Equivalent Model of Central China Power Grid and Sichuan-Chongqin Power Network
Shunyi Wang
Abstract
Shunyi Wang
Abstract
Appropriate number of power grid buses is the base of experimentation on RTDS.The number of entire power grid buses is reduced to sixteen or nineteen,and the problem of the insufficient capability of RTDS is solved.The results from steady state power flow calculation before and after the simplification show that the distortion before and after the simplification are fairly little,and it satisfies the request of RTDS simulation.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Appropriate number of power grid buses is the base of experimentation on RTDS.The number of entire power grid buses is reduced to sixteen or nineteen,and the problem of the insufficient capability of RTDS is solved.The results from steady state power flow calculation before and after the simplification show that the distortion before and after the simplification are fairly little,and it satisfies the request of RTDS simulation.
Key concepts: Power flow, Power grid, Grid, Power (physics), Power network, Distortion (music), State (computer science), Base (topology)