ANALYSIS ON BULLDING GAS-STEAM COMBINED CYCLE POWER PLANT FOR OPTIMIZING THE POWER SOURCE STRUCTURE
Guanhua Li
Abstract
Guanhua Li
Abstract
The status quo of power industry development in Henan Province and main problems existing in the power system are described,the possibility and necessity of building gas-steam combined cycle power plant are analyzed,a technic and economic comparison of gas-steam combined cycle power plant with pumped storage station,domestic desulferized and non-desulferized coal-fired power plants is given as well.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The status quo of power industry development in Henan Province and main problems existing in the power system are described,the possibility and necessity of building gas-steam combined cycle power plant are analyzed,a technic and economic comparison of gas-steam combined cycle power plant with pumped storage station,domestic desulferized and non-desulferized coal-fired power plants is given as well.
Key concepts: Power station, Combined cycle, Steam-electric power station, Steam power, Peaking power plant, Engineering, Coal, Status quo