2010Port & Waterway EngineeringRequires access

Three dimensional tide numerical simulation in reclamation of Yangshan Deepwater Port Phase I Project

Xie Jun

Open publisher page 0 citations

Abstract

The first application of generalized curvilinear 3-D tidal numerical model in Xiaoyangshan-Huogaitang reclamation of Yangshan Deepwater Port Phase I Project and its important role in the engineering scheme research and engineering design construction are presented.

About this research paper

What this paper is about

The first application of generalized curvilinear 3-D tidal numerical model in Xiaoyangshan-Huogaitang reclamation of Yangshan Deepwater Port Phase I Project and its important role in the engineering scheme research and engineering design construction are presented.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The first application of generalized curvilinear 3-D tidal numerical model in Xiaoyangshan-Huogaitang reclamation of Yangshan Deepwater Port Phase I Project and its important role in the engineering scheme research and engineering design construction are presented.

Key concepts: Land reclamation, Port (circuit theory), Curvilinear coordinates, Marine engineering, Civil engineering, Geology, Computer science, Engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Three dimensional tide numerical simulation in reclamation of Yangshan Deepwater Port Phase I Project — Research Paper | ScholarLens