2005Chinese journal of rock mechanics and engineeringRequires access

ANALYSIS OF CONSTRUCTION EFFECTS OF CHANGLIANGSHAN TUNNEL DURING EXCAVATION AND SUPPORTING IN HORIZONTAL SOFT SURROUNDING ROCK MASS

Bin Du

Open publisher page 0 citations

Abstract

In light of the construction difficulty during building a long tunnel in soft rock mass,the 3D numerical simulation is used to analyze the construction schedule of the Changliangshan tunnel. According to the numerical simulation results,the characteristics of rock stress distribution and rock deformation becomes explicit in the case of short excavation footage. Consequently,it is reasonable to take above-mentioned construction scheme to excavate Changliangshan tunnel.

About this research paper

What this paper is about

In light of the construction difficulty during building a long tunnel in soft rock mass,the 3D numerical simulation is used to analyze the construction schedule of the Changliangshan tunnel. According to the numerical simulation results,the characteristics of rock stress distribution and rock deformation becomes explicit in the case of short excavation footage. Consequently,it is reasonable to take above-mentioned construction scheme to excavate Changliangshan tunnel.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In light of the construction difficulty during building a long tunnel in soft rock mass,the 3D numerical simulation is used to analyze the construction schedule of the Changliangshan tunnel. According to the numerical simulation results,the characteristics of rock stress distribution and rock deformation becomes explicit in the case of short excavation footage. Consequently,it is reasonable to take above-mentioned construction scheme to excavate Changliangshan tunnel.

Key concepts: Excavation, Rock mass classification, Geotechnical engineering, Tunnel construction, Deformation (meteorology), Geology, Computer simulation, Schedule

Related papers

Back to paper searchBrowse research topicsOriginal source
ANALYSIS OF CONSTRUCTION EFFECTS OF CHANGLIANGSHAN TUNNEL DURING EXCAVATION AND SUPPORTING IN HORIZONTAL SOFT SURROUNDING ROCK MASS — Research Paper | ScholarLens