2010•Journal of Heilongjiang Institute of Science and TechnologyRequires access

Rock burst control of Dongrong NO.2 colliery recovery roadway

Weiwei Wang

Open publisher page 0 citations

Abstract

Aimed at an effective control of the rock burst accident of Dongrong NO.2 colliery 17# coal,this paper provides an analysis of the main factors leading to rock burst,based on pressure accident investigation and proposes the organic combination of exploration,measurement,control deep roadway burst control theory.The results show that the mine rock burst is mainly attributed to the mining depth deeper than the critical depth where there occurs rock burst,the occurrence of peninsula pillar and many faults in coal,and irrational support structure.A better control effect results from the application of mine pressure disaster control techniques,such as advanced exploration,surrounding rock observation,timely forecasts,quality monitoring,and symptomatic program,and integrated control measures,such as disaster predicting cuttings,drilling pressure relief,and danger-eliminating loose blasting.The study provides a technical support of rock burst prevention and control of Dongrong NO.2 colliery.

About this research paper

What this paper is about

Aimed at an effective control of the rock burst accident of Dongrong NO.2 colliery 17# coal,this paper provides an analysis of the main factors leading to rock burst,based on pressure accident investigation and proposes the organic combination of exploration,measurement,control deep roadway burst control theory.The results show that the mine rock burst is mainly attributed to the mining depth deeper than the critical depth where there occurs rock burst,the occurrence of peninsula pillar and many faults in coal,and irrational support structure.A better control effect results from the application of mine pressure disaster control techniques,such as advanced exploration,surrounding rock observation,timely forecasts,quality monitoring,and symptomatic program,and integrated control measures,such as disaster predicting cuttings,drilling pressure relief,and danger-eliminating loose blasting.The study provides a technical support of rock burst prevention and control of Dongrong NO.2 colliery.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Aimed at an effective control of the rock burst accident of Dongrong NO.2 colliery 17# coal,this paper provides an analysis of the main factors leading to rock burst,based on pressure accident investigation and proposes the organic combination of exploration,measurement,control deep roadway burst control theory.The results show that the mine rock burst is mainly attributed to the mining depth deeper than the critical depth where there occurs rock burst,the occurrence of peninsula pillar and many faults in coal,and irrational support structure.A better control effect results from the application of mine pressure disaster control techniques,such as advanced exploration,surrounding rock observation,timely forecasts,quality monitoring,and symptomatic program,and integrated control measures,such as disaster predicting cuttings,drilling pressure relief,and danger-eliminating loose blasting.The study provides a technical support of rock burst prevention and control of Dongrong NO.2 colliery.

Key concepts: Rock burst, Coal mining, Mining engineering, Coal, Drilling, Geology, Rock blasting, Geotechnical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Rock burst control of Dongrong NO.2 colliery recovery roadway — Research Paper | ScholarLens