Conticaster automatic controlling system in the First Steel Plant of Taiyuan Steel Co. Ltd.
Wenbin Li
Abstract
Wenbin Li
Abstract
The paper analyses conticaster automatic controllin g system in the fir st steel plant of Taiyuan Steel Co. Ltd, discusses the composition of control sy stem, electric control of main mechanical equipment, main monitoring and control ling system, puts forward application of conticaster automatic control and frequ ency conversion speeder control, studies PLC control system, monitoring system a nd communication network central control. It reaches effect of reducing cost, en ergy conservation, running stably and reliably, solves its application from outd ated semi?automatic control to full? automatic control, and to converter speed control.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The paper analyses conticaster automatic controllin g system in the fir st steel plant of Taiyuan Steel Co. Ltd, discusses the composition of control sy stem, electric control of main mechanical equipment, main monitoring and control ling system, puts forward application of conticaster automatic control and frequ ency conversion speeder control, studies PLC control system, monitoring system a nd communication network central control. It reaches effect of reducing cost, en ergy conservation, running stably and reliably, solves its application from outd ated semi?automatic control to full? automatic control, and to converter speed control.
Key concepts: Automatic control, Control system, Control (management), Engineering, Automotive engineering, Fully automatic, Control engineering, Steel mill