Research and Design of TP75 Overhead Launching Gantry for Segmental Assembling of Sutong Bridge
Yi Zou
Abstract
Yi Zou
Abstract
The main parts of the approach bridges of Sutong Bridge are of twin prestressed concrete continuous girder bridges with spans each 75 m of constant cross sections and six lanes on the carriageways,and the superstructures of the parts of the bridges were erected by precast segmental assembling construction method.In this paper,the design alternatives,principal components and construction sequences of the TP75 overhead launching gantry used for the segmental assembling of the bridges are described.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The main parts of the approach bridges of Sutong Bridge are of twin prestressed concrete continuous girder bridges with spans each 75 m of constant cross sections and six lanes on the carriageways,and the superstructures of the parts of the bridges were erected by precast segmental assembling construction method.In this paper,the design alternatives,principal components and construction sequences of the TP75 overhead launching gantry used for the segmental assembling of the bridges are described.
Key concepts: Precast concrete, Structural engineering, Engineering, Bridge (graph theory), Prestressed concrete, Girder, Overhead (engineering), Box girder