2011Journal of Highway and Transportation Research and DevelopmentRequires access

In-situ Test of Pile-soil Stress Ratio of CFG Pile Composite Foundation under Embankment Load

Wan Bao

Open publisher page 0 citations

Abstract

In-situ tests on pile-soil stress ratio of CFG pile composite foundation under earthfill embankment in Dexing-Nanchang freeway were carried out.The test results of pile-soil stress ratio of CFG pile composite foundation with different pile spacings in embankment filling in construction and in static loading test with rigid board were analyzed.The regularities of pile-soil stress ratio varying with load and time were discussed.The results show that(1) The variation of pile-soil stress ratio under embankment load is quite different from that under rigid load,the pile-soil stress ratio which tested in embankment construction is much less than that under rigid load.(2) The pile-soil stress ratio increased quickly when the height of soil was within 2.0 m.With a higher soil-filling height within 2~3.5 m,the pile-soil stress ratio decreased rapidly.When the soil-filling height was higher than 3.5 m,the stress ratio started to go up gradually,and then fluctuated.The values of pile-soil stress ratio fluctuated and stabilized in the range of 1.18~2.26 at last,and changed hardly with time.(3) The pile-soil stress ratio decreased with the increase of pile spacing,and the pile-soil stress ratio changes tiny when the pile spacing increased to a certain value.

About this research paper

What this paper is about

In-situ tests on pile-soil stress ratio of CFG pile composite foundation under earthfill embankment in Dexing-Nanchang freeway were carried out.The test results of pile-soil stress ratio of CFG pile composite foundation with different pile spacings in embankment filling in construction and in static loading test with rigid board were analyzed.The regularities of pile-soil stress ratio varying with load and time were discussed.The results show that(1) The variation of pile-soil stress ratio under embankment load is quite different from that under rigid load,the pile-soil stress ratio which tested in embankment construction is much less than that under rigid load.(2) The pile-soil stress ratio increased quickly when the height of soil was within 2.0 m.With a higher soil-filling height within 2~3.5 m,the pile-soil stress ratio decreased rapidly.When the soil-filling height was higher than 3.5 m,the stress ratio started to go up gradually,and then fluctuated.The values of pile-soil stress ratio fluctuated and stabilized in the range of 1.18~2.26 at last,and changed hardly with time.(3) The pile-soil stress ratio decreased with the increase of pile spacing,and the pile-soil stress ratio changes tiny when the pile spacing increased to a certain value.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In-situ tests on pile-soil stress ratio of CFG pile composite foundation under earthfill embankment in Dexing-Nanchang freeway were carried out.The test results of pile-soil stress ratio of CFG pile composite foundation with different pile spacings in embankment filling in construction and in static loading test with rigid board were analyzed.The regularities of pile-soil stress ratio varying with load and time were discussed.The results show that(1) The variation of pile-soil stress ratio under embankment load is quite different from that under rigid load,the pile-soil stress ratio which tested in embankment construction is much less than that under rigid load.(2) The pile-soil stress ratio increased quickly when the height of soil was within 2.0 m.With a higher soil-filling height within 2~3.5 m,the pile-soil stress ratio decreased rapidly.When the soil-filling height was higher than 3.5 m,the stress ratio started to go up gradually,and then fluctuated.The values of pile-soil stress ratio fluctuated and stabilized in the range of 1.18~2.26 at last,and changed hardly with time.(3) The pile-soil stress ratio decreased with the increase of pile spacing,and the pile-soil stress ratio changes tiny when the pile spacing increased to a certain value.

Key concepts: Pile, Geotechnical engineering, Levee, Foundation (evidence), Stress (linguistics), Pile cap, Geology, Linguistics

Related papers

Back to paper searchBrowse research topicsOriginal source
In-situ Test of Pile-soil Stress Ratio of CFG Pile Composite Foundation under Embankment Load — Research Paper | ScholarLens