Construction Techniques for Precasting of 32-m Span PC Box Girders of Wuhan-Guangzhou Passenger Dedicated Railway

Zhu Chen

Open publisher page 0 citations

Abstract

The total length of Wuhan-Guangzhou Passenger Dedicated Railway is 1 068 km,of which the length of the bridges and tunnels on the railway accounts for 66.7%.For the bridges,the double-track full-span simply-supported prestressed concrete(PC) box girders arranged in 32 m equal spans are the major structural type.The girders were precast with high performance concrete in each full span in precast yards through the principal working procedures of the construction preparation,formwork construction,concrete construction,prestressing construction and the quality of precasting of the girders in such procedures was good.

About this research paper

What this paper is about

The total length of Wuhan-Guangzhou Passenger Dedicated Railway is 1 068 km,of which the length of the bridges and tunnels on the railway accounts for 66.7%.For the bridges,the double-track full-span simply-supported prestressed concrete(PC) box girders arranged in 32 m equal spans are the major structural type.The girders were precast with high performance concrete in each full span in precast yards through the principal working procedures of the construction preparation,formwork construction,concrete construction,prestressing construction and the quality of precasting of the girders in such procedures was good.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The total length of Wuhan-Guangzhou Passenger Dedicated Railway is 1 068 km,of which the length of the bridges and tunnels on the railway accounts for 66.7%.For the bridges,the double-track full-span simply-supported prestressed concrete(PC) box girders arranged in 32 m equal spans are the major structural type.The girders were precast with high performance concrete in each full span in precast yards through the principal working procedures of the construction preparation,formwork construction,concrete construction,prestressing construction and the quality of precasting of the girders in such procedures was good.

Key concepts: Precast concrete, Girder, Engineering, Formwork, Span (engineering), Box girder, Structural engineering, Prestressed concrete