2012Automation and InstrumentationRequires access

Push and push the coke coke car positioning data management

Wang Xiao-h

Open publisher page 0 citations

Abstract

Based on the coke pushing oven number identification technology and wireless communication technology,combined with the actual production of Kunming Steel's coking plant level and operation plan,realize the coke pushing data operation management.

About this research paper

What this paper is about

Based on the coke pushing oven number identification technology and wireless communication technology,combined with the actual production of Kunming Steel's coking plant level and operation plan,realize the coke pushing data operation management.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Based on the coke pushing oven number identification technology and wireless communication technology,combined with the actual production of Kunming Steel's coking plant level and operation plan,realize the coke pushing data operation management.

Key concepts: Coke, Coke oven, Waste management, Engineering, Production (economics), Plan (archaeology), Process engineering, Manufacturing engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Push and push the coke coke car positioning data management — Research Paper | ScholarLens