2004•Petroleum Geology & Oilfield Development in DaqingRequires access

Casing shapes and its workover technique for Casing Damage Wells

Jin Yan-song

Open publisher page 0 citations

Abstract

Casing damage will cause a big economic loss.To different casing damage wells, the appropriate workover technique should be chosen.Several serious casing damage wells include:casing diameter is less than 70 mm,falling matter is the same depth with casing fracture,sand input as serious cave-in,long section bend and shape change,and serious damage for many points.To above several type wells,combining the newest workover researching result in Daqing oilfield,the suitable workover technique is given.The better results are obtained through field application.

About this research paper

What this paper is about

Casing damage will cause a big economic loss.To different casing damage wells, the appropriate workover technique should be chosen.Several serious casing damage wells include:casing diameter is less than 70 mm,falling matter is the same depth with casing fracture,sand input as serious cave-in,long section bend and shape change,and serious damage for many points.To above several type wells,combining the newest workover researching result in Daqing oilfield,the suitable workover technique is given.The better results are obtained through field application.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Casing damage will cause a big economic loss.To different casing damage wells, the appropriate workover technique should be chosen.Several serious casing damage wells include:casing diameter is less than 70 mm,falling matter is the same depth with casing fracture,sand input as serious cave-in,long section bend and shape change,and serious damage for many points.To above several type wells,combining the newest workover researching result in Daqing oilfield,the suitable workover technique is given.The better results are obtained through field application.

Key concepts: Workover, Casing, Petroleum engineering, Geology, Oil field, Wellbore, Geotechnical engineering, Completion (oil and gas wells)

Related papers

Back to paper searchBrowse research topicsOriginal source
Casing shapes and its workover technique for Casing Damage Wells — Research Paper | ScholarLens