Key Workmanship and Quality Control of Steel Box Girder Fabrication for Taoyaomen Bridge in Zhoushan
Yang Yuan-lu
Abstract
Yang Yuan-lu
Abstract
The main bridge of Taoyaomen Bridge in Zhoushan is a 7-span semi-floating system and continuous hybrid girder cable-stayed bridge of double pylons and double cable planes.The side spans of the Bridge are of concrete box girders while the central span is of streamlined flat steel box girder.In this paper,the key workmanship and techniques for fabrication of the steel box girder of the main bridge and quality control measures adopted in the fabrication process are expounded.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The main bridge of Taoyaomen Bridge in Zhoushan is a 7-span semi-floating system and continuous hybrid girder cable-stayed bridge of double pylons and double cable planes.The side spans of the Bridge are of concrete box girders while the central span is of streamlined flat steel box girder.In this paper,the key workmanship and techniques for fabrication of the steel box girder of the main bridge and quality control measures adopted in the fabrication process are expounded.
Key concepts: Workmanship, Bridge (graph theory), Box girder, Engineering, Structural engineering, Girder, Span (engineering), Fabrication