CONSTRUCTION TECHNOLOG FOR CONCRETE-FILLED STEEL TUBE RIGID TIED BAR ARCH BRIDGE
LI San-zhen
Abstract
LI San-zhen
Abstract
Nielsen system concrete-filled steel tube rigid tied bar arch bridge could meet the meets of heavy haul railway and high speed with large longitudinal stiffness superior dynamic performance.The bridge adopted the construction method of arch first and beam and cantilever construction technique of tied girder.The assemble of arc-rib,arch segment lifting,cast-in-place and cantilever construction of tied girder were studies that the construction followed the design rule to meet the requirements of the design and construction code.
OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Nielsen system concrete-filled steel tube rigid tied bar arch bridge could meet the meets of heavy haul railway and high speed with large longitudinal stiffness superior dynamic performance.The bridge adopted the construction method of arch first and beam and cantilever construction technique of tied girder.The assemble of arc-rib,arch segment lifting,cast-in-place and cantilever construction of tied girder were studies that the construction followed the design rule to meet the requirements of the design and construction code.
Key concepts: Structural engineering, Cantilever, Arch bridge, Arch, Bridge (graph theory), Stiffness, Bar (unit), Beam bridge