CONSTRUCTION TECHNOLOG FOR CONCRETE-FILLED STEEL TUBE RIGID TIED BAR ARCH BRIDGE

LI San-zhen

Open publisher page 1 citations

Abstract

Nielsen system concrete-filled steel tube rigid tied bar arch bridge could meet the meets of heavy haul railway and high speed with large longitudinal stiffness superior dynamic performance.The bridge adopted the construction method of arch first and beam and cantilever construction technique of tied girder.The assemble of arc-rib,arch segment lifting,cast-in-place and cantilever construction of tied girder were studies that the construction followed the design rule to meet the requirements of the design and construction code.

About this research paper

What this paper is about

Nielsen system concrete-filled steel tube rigid tied bar arch bridge could meet the meets of heavy haul railway and high speed with large longitudinal stiffness superior dynamic performance.The bridge adopted the construction method of arch first and beam and cantilever construction technique of tied girder.The assemble of arc-rib,arch segment lifting,cast-in-place and cantilever construction of tied girder were studies that the construction followed the design rule to meet the requirements of the design and construction code.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Nielsen system concrete-filled steel tube rigid tied bar arch bridge could meet the meets of heavy haul railway and high speed with large longitudinal stiffness superior dynamic performance.The bridge adopted the construction method of arch first and beam and cantilever construction technique of tied girder.The assemble of arc-rib,arch segment lifting,cast-in-place and cantilever construction of tied girder were studies that the construction followed the design rule to meet the requirements of the design and construction code.

Key concepts: Structural engineering, Cantilever, Arch bridge, Arch, Bridge (graph theory), Stiffness, Bar (unit), Beam bridge

Related papers

Back to paper searchBrowse research topicsOriginal source
CONSTRUCTION TECHNOLOG FOR CONCRETE-FILLED STEEL TUBE RIGID TIED BAR ARCH BRIDGE — Research Paper | ScholarLens