2004Communications StandardizationRequires access

Construction Skill for High Pier Liquid Turning Model Equipment

Jianhui Wu

Open publisher page 0 citations

Abstract

The construction method for pier of a bridge(up to60meters)of turning model by liquid is not only safety,reliable but also high-speed in construction and has a high quality for pier of a bridge by concrete that could reduce the labor intensity.

About this research paper

What this paper is about

The construction method for pier of a bridge(up to60meters)of turning model by liquid is not only safety,reliable but also high-speed in construction and has a high quality for pier of a bridge by concrete that could reduce the labor intensity.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The construction method for pier of a bridge(up to60meters)of turning model by liquid is not only safety,reliable but also high-speed in construction and has a high quality for pier of a bridge by concrete that could reduce the labor intensity.

Key concepts: Pier, Bridge (graph theory), Engineering, Quality (philosophy), Forensic engineering, Structural engineering, Civil engineering, Medicine

Related papers

Back to paper searchBrowse research topicsOriginal source
Construction Skill for High Pier Liquid Turning Model Equipment — Research Paper | ScholarLens