Tower Head Hoisting and Installation for the UHV Transmission Line Yellow River Large Crossing

Yin Chuan-yi

Open publisher page 0 citations

Abstract

Analysis of tower head of UHV transmission line Yellow River large crossing is performed.Based on available hoisting and installation equipment,innovative construction techniques that installs auxiliary lifting pole on tower body and extends pole arm hoisting range,are created.The appropriate nodes and optimum connection method are calculated to combine the lifting pole and tower together to stabilize the pole and increase its hoisting capability to realize tower head installation for the Yellow River large crossing.

About this research paper

What this paper is about

Analysis of tower head of UHV transmission line Yellow River large crossing is performed.Based on available hoisting and installation equipment,innovative construction techniques that installs auxiliary lifting pole on tower body and extends pole arm hoisting range,are created.The appropriate nodes and optimum connection method are calculated to combine the lifting pole and tower together to stabilize the pole and increase its hoisting capability to realize tower head installation for the Yellow River large crossing.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Analysis of tower head of UHV transmission line Yellow River large crossing is performed.Based on available hoisting and installation equipment,innovative construction techniques that installs auxiliary lifting pole on tower body and extends pole arm hoisting range,are created.The appropriate nodes and optimum connection method are calculated to combine the lifting pole and tower together to stabilize the pole and increase its hoisting capability to realize tower head installation for the Yellow River large crossing.

Key concepts: Tower, Head (geology), Engineering, Transmission line, Line (geometry), Transmission (telecommunications), Electrical engineering, Marine engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Tower Head Hoisting and Installation for the UHV Transmission Line Yellow River Large Crossing — Research Paper | ScholarLens