2011•Shanxi ArchitectureRequires access

Construction control of long-span continuous girder bridge with variable cross-section

Zhang San-ji

Open publisher page 0 citations

Abstract

In this paper,based on a long-span continuous girder bridge with variable cross-section,general software Doctor Bridge 3.0is used for theoretical analysis and combined with field monitoring results,construction control methods are obtained,which can provide guidance for other similar bridges.

About this research paper

What this paper is about

In this paper,based on a long-span continuous girder bridge with variable cross-section,general software Doctor Bridge 3.0is used for theoretical analysis and combined with field monitoring results,construction control methods are obtained,which can provide guidance for other similar bridges.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In this paper,based on a long-span continuous girder bridge with variable cross-section,general software Doctor Bridge 3.0is used for theoretical analysis and combined with field monitoring results,construction control methods are obtained,which can provide guidance for other similar bridges.

Key concepts: Bridge (graph theory), Span (engineering), Section (typography), Structural engineering, Engineering, Variable (mathematics), Girder, Computer science

Related papers

Back to paper searchBrowse research topicsOriginal source
Construction control of long-span continuous girder bridge with variable cross-section — Research Paper | ScholarLens