Closure Design of Main Bridge of Fumin Bridge in Shenyang

Xinyu Zhang

Open publisher page 1 citations

Abstract

The main bridge of Fumin Bridge in Shenyang is a prestressed concrete cable-stayed bridge with span arrangement (89 +242 +89) m, and with double kinked pylons and single cable plane. On the main span and two side spans of the main bridge, there is each one closure segment, 2 m in length, and along with the closing of the spans, the Bridge has completed two time of structural system transformation. In this paper, the analytic calculations, structural design and sequences for the closure construction are described in details.

About this research paper

What this paper is about

The main bridge of Fumin Bridge in Shenyang is a prestressed concrete cable-stayed bridge with span arrangement (89 +242 +89) m, and with double kinked pylons and single cable plane. On the main span and two side spans of the main bridge, there is each one closure segment, 2 m in length, and along with the closing of the spans, the Bridge has completed two time of structural system transformation. In this paper, the analytic calculations, structural design and sequences for the closure construction are described in details.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The main bridge of Fumin Bridge in Shenyang is a prestressed concrete cable-stayed bridge with span arrangement (89 +242 +89) m, and with double kinked pylons and single cable plane. On the main span and two side spans of the main bridge, there is each one closure segment, 2 m in length, and along with the closing of the spans, the Bridge has completed two time of structural system transformation. In this paper, the analytic calculations, structural design and sequences for the closure construction are described in details.

Key concepts: Bridge (graph theory), Closure (psychology), Span (engineering), Structural engineering, Beam bridge, Prestressed concrete, Engineering, Pylon

Related papers

Back to paper searchBrowse research topicsOriginal source
Closure Design of Main Bridge of Fumin Bridge in Shenyang — Research Paper | ScholarLens