2010Shanxi Science and TechnologyRequires access

Bored Pile Construction

Hao Yife

Open publisher page 0 citations

Abstract

The paper introduces the construction of Tanshang Bridge in Gujiao and explains the construction process and methods of bored piles.

About this research paper

What this paper is about

The paper introduces the construction of Tanshang Bridge in Gujiao and explains the construction process and methods of bored piles.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The paper introduces the construction of Tanshang Bridge in Gujiao and explains the construction process and methods of bored piles.

Key concepts: Pile, Geology, Computer science, Geotechnical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Bored Pile Construction — Research Paper | ScholarLens