Research on Stable Production Technology for Complex Fault Block in High Water-Cut Period
Dang Hon
Abstract
Dang Hon
Abstract
For matured oilfield which has stepped into high water-cut period, it usually faces much problem, such as serious contradiction between injection and production, increasingly complex oil distribution, declining production, etc. We took Gang-Dong oilfield as an example in this paper to analyze the well conditions, well pattern, development status and well nets reconstruction, and to optimize the development index by reservoir engineering. In this way, the development effect of Gang-Dong oilfield has been improved. The result can be used as a reference for similar oilfield.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
For matured oilfield which has stepped into high water-cut period, it usually faces much problem, such as serious contradiction between injection and production, increasingly complex oil distribution, declining production, etc. We took Gang-Dong oilfield as an example in this paper to analyze the well conditions, well pattern, development status and well nets reconstruction, and to optimize the development index by reservoir engineering. In this way, the development effect of Gang-Dong oilfield has been improved. The result can be used as a reference for similar oilfield.
Key concepts: Water cut, Fault block, Petroleum engineering, Production (economics), Fault (geology), Period (music), Block (permutation group theory), Environmental science