2011•Drilling & Production TechnologyRequires access

STUDY ON EFFICIENCY OF HORIZONTAL WELL DEVELOPMENT IN COMPLEX FAULT-BLOCK OIL RESERVOIR

Yuetian Liu, Moe Key

Open publisher page 0 citations

Abstract

Six development schemes were designed based on the result of fine reservoir description of Gaoshangbao oilfield,and the a ratio of total oil produced to OOIP and water-cut change laws of every scheme were obtained by applying reservoir numerical simulation method.According to the development effectiveness evaluation of the overall and partial reservoir and the different development stage and different type of horizontal wells,the applicability of horizontal wells development in fault block reservoir was studied.The conclusion was that the earlier adopting horizontal wells,the better result will be got.The mixed injection-production well pattern which included vertical wells and horizontal wells was good to carry out in complicated fault block reservoirs.The production total rate of high-deviated wells and double branch horizontal wells was higher than other types well.

About this research paper

What this paper is about

Six development schemes were designed based on the result of fine reservoir description of Gaoshangbao oilfield,and the a ratio of total oil produced to OOIP and water-cut change laws of every scheme were obtained by applying reservoir numerical simulation method.According to the development effectiveness evaluation of the overall and partial reservoir and the different development stage and different type of horizontal wells,the applicability of horizontal wells development in fault block reservoir was studied.The conclusion was that the earlier adopting horizontal wells,the better result will be got.The mixed injection-production well pattern which included vertical wells and horizontal wells was good to carry out in complicated fault block reservoirs.The production total rate of high-deviated wells and double branch horizontal wells was higher than other types well.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Six development schemes were designed based on the result of fine reservoir description of Gaoshangbao oilfield,and the a ratio of total oil produced to OOIP and water-cut change laws of every scheme were obtained by applying reservoir numerical simulation method.According to the development effectiveness evaluation of the overall and partial reservoir and the different development stage and different type of horizontal wells,the applicability of horizontal wells development in fault block reservoir was studied.The conclusion was that the earlier adopting horizontal wells,the better result will be got.The mixed injection-production well pattern which included vertical wells and horizontal wells was good to carry out in complicated fault block reservoirs.The production total rate of high-deviated wells and double branch horizontal wells was higher than other types well.

Key concepts: Fault block, Petroleum engineering, Water cut, Geology, Fault (geology), Block (permutation group theory), Oil production, Water well

Related papers

Back to paper searchBrowse research topicsOriginal source
STUDY ON EFFICIENCY OF HORIZONTAL WELL DEVELOPMENT IN COMPLEX FAULT-BLOCK OIL RESERVOIR — Research Paper | ScholarLens