2011•Journal of Xi'an Shiyou UniversityRequires access

Reasonable development policy of Chang 4+5 reservoir in Baiyu mountain area

YU Bao-cai

Open publisher page 0 citations

Abstract

To enhance the ultimate recovery factor of Chang 4+5 reservoir in the studied area and realize stabilizing oil production and controlling water cut,the reasonable formation pressure,flow pressure,injection-production ratio and the highest well-head injection pressure are determined by the analysis of the production data,the pressure testing data and other related data over the years.And the development measures are improved:properly reducing injection-production ratio and formation pressure,carrying out cyclic waterflooding tests to delaying the water breakthrough of oil wells,developing regional chemical profile-control tests to control the water breakthroug of oil wells,implementing acidizing plugging removal to improve the output of oil wells,and so on.These measures provide guarantee for stabilizing oil production and controlling water cut of the reservoir.

About this research paper

What this paper is about

To enhance the ultimate recovery factor of Chang 4+5 reservoir in the studied area and realize stabilizing oil production and controlling water cut,the reasonable formation pressure,flow pressure,injection-production ratio and the highest well-head injection pressure are determined by the analysis of the production data,the pressure testing data and other related data over the years.And the development measures are improved:properly reducing injection-production ratio and formation pressure,carrying out cyclic waterflooding tests to delaying the water breakthrough of oil wells,developing regional chemical profile-control tests to control the water breakthroug of oil wells,implementing acidizing plugging removal to improve the output of oil wells,and so on.These measures provide guarantee for stabilizing oil production and controlling water cut of the reservoir.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

To enhance the ultimate recovery factor of Chang 4+5 reservoir in the studied area and realize stabilizing oil production and controlling water cut,the reasonable formation pressure,flow pressure,injection-production ratio and the highest well-head injection pressure are determined by the analysis of the production data,the pressure testing data and other related data over the years.And the development measures are improved:properly reducing injection-production ratio and formation pressure,carrying out cyclic waterflooding tests to delaying the water breakthrough of oil wells,developing regional chemical profile-control tests to control the water breakthroug of oil wells,implementing acidizing plugging removal to improve the output of oil wells,and so on.These measures provide guarantee for stabilizing oil production and controlling water cut of the reservoir.

Key concepts: Petroleum engineering, Water cut, Water injection (oil production), Oil production, Oil well, Environmental science, Petroleum, Pressure control

Related papers

Back to paper searchBrowse research topicsOriginal source
Reasonable development policy of Chang 4+5 reservoir in Baiyu mountain area — Research Paper | ScholarLens