2014Uranium Mining and MetallurgyRequires access

Analysis of factors affecting the effect of stope leaching

Xie Wang-na

Open publisher page 0 citations

Abstract

The industrial test and industrial trial production of stope leaching were carried out at Taoshan orefield of Dabu deposit.The results of test and trial production showed obvious differences in leaching rate and leaching time.Compared with industrial trial production of stope leaching,the leaching rate of industrial test was higher,and leaching time was shorter.It was considered that the blasting method and liquid arrangement were the main factors affecting the leaching rate and leaching time according to analysis.So we put forward the following suggestions:the technique of deep hole slicing tight-face blasting was used to reduce the yield of lump ores,the effective liquid arrangement methods were adopted to make the lixiviant infiltrating throughout whole ore heap,and bacterial leaching was introduced.

About this research paper

What this paper is about

The industrial test and industrial trial production of stope leaching were carried out at Taoshan orefield of Dabu deposit.The results of test and trial production showed obvious differences in leaching rate and leaching time.Compared with industrial trial production of stope leaching,the leaching rate of industrial test was higher,and leaching time was shorter.It was considered that the blasting method and liquid arrangement were the main factors affecting the leaching rate and leaching time according to analysis.So we put forward the following suggestions:the technique of deep hole slicing tight-face blasting was used to reduce the yield of lump ores,the effective liquid arrangement methods were adopted to make the lixiviant infiltrating throughout whole ore heap,and bacterial leaching was introduced.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The industrial test and industrial trial production of stope leaching were carried out at Taoshan orefield of Dabu deposit.The results of test and trial production showed obvious differences in leaching rate and leaching time.Compared with industrial trial production of stope leaching,the leaching rate of industrial test was higher,and leaching time was shorter.It was considered that the blasting method and liquid arrangement were the main factors affecting the leaching rate and leaching time according to analysis.So we put forward the following suggestions:the technique of deep hole slicing tight-face blasting was used to reduce the yield of lump ores,the effective liquid arrangement methods were adopted to make the lixiviant infiltrating throughout whole ore heap,and bacterial leaching was introduced.

Key concepts: Lixiviant, Leaching (pedology), Heap leaching, Environmental science, Waste management, Metallurgy, Engineering, Materials science