Control System Reconstruction for 4W1 Magnet Power Supply in BEPC
王春红, 刘佳, 赵籍九, Chunhong Wang, J Liu, JJ Zhao
Abstract
王春红, 刘佳, 赵籍九, Chunhong Wang, J Liu, JJ Zhao
Abstract
4W1 magnet in BEPC for Synchrotron Radiation X-Ray beam lines consists of main resistance winding and auxiliary resistance winding which are respectively powered by two independent power supplies with high precision. These two power supplies called main power supply and auxiliary power supply are rebuilt with a new interface PSI (power supply interface). They are controlled by a PSC (power supply controller). This system is completed within one month after the control prototype for BEPC II magnet power supplies with PSC/PSI has been finished. During the beginning of this system running, it is modified many times to meet its operation requirements. It has been running for about four months without big problems so that it ensures synchrotron radiation research on the two X-ray beam lines. This paper describes a new control system based on EPICS for 4W1 magnet power supplies. The requirements to 4W1 magnet ramp and its ramp programming are also discussed.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
4W1 magnet in BEPC for Synchrotron Radiation X-Ray beam lines consists of main resistance winding and auxiliary resistance winding which are respectively powered by two independent power supplies with high precision. These two power supplies called main power supply and auxiliary power supply are rebuilt with a new interface PSI (power supply interface). They are controlled by a PSC (power supply controller). This system is completed within one month after the control prototype for BEPC II magnet power supplies with PSC/PSI has been finished. During the beginning of this system running, it is modified many times to meet its operation requirements. It has been running for about four months without big problems so that it ensures synchrotron radiation research on the two X-ray beam lines. This paper describes a new control system based on EPICS for 4W1 magnet power supplies. The requirements to 4W1 magnet ramp and its ramp programming are also discussed.
Key concepts: Magnet, Physics, Power (physics), Synchrotron radiation, Electrical engineering, Beam (structure), Synchrotron, Interface (matter)