Analysis and Evaluation on the Diversion Tunnel Monitoring of Gongboxia Hydropower Station

Zhang Xiu-shan

Open publisher page 0 citations

Abstract

The blocking of section 0+159 m-I.0+214 m has been implemented one month after the diversion tunnel of Gongboxia Hydropower Station started to impound.However,the downstream of the section 0+214 m has been changed into the right bank of cyclone spillway section under the adit,the swirling flow of holes,water plunge pool and the back water tunnel.So,the security of the sections down the section 0+214 m directly affects flood discharge of the barilleri.This paper will have a comprehensive analysis,research,and evaluation for monitoring data on 4 monitoring sections below the body of Gongboxia Hydropower Station 0+214 m diversion tunnel.

About this research paper

What this paper is about

The blocking of section 0+159 m-I.0+214 m has been implemented one month after the diversion tunnel of Gongboxia Hydropower Station started to impound.However,the downstream of the section 0+214 m has been changed into the right bank of cyclone spillway section under the adit,the swirling flow of holes,water plunge pool and the back water tunnel.So,the security of the sections down the section 0+214 m directly affects flood discharge of the barilleri.This paper will have a comprehensive analysis,research,and evaluation for monitoring data on 4 monitoring sections below the body of Gongboxia Hydropower Station 0+214 m diversion tunnel.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The blocking of section 0+159 m-I.0+214 m has been implemented one month after the diversion tunnel of Gongboxia Hydropower Station started to impound.However,the downstream of the section 0+214 m has been changed into the right bank of cyclone spillway section under the adit,the swirling flow of holes,water plunge pool and the back water tunnel.So,the security of the sections down the section 0+214 m directly affects flood discharge of the barilleri.This paper will have a comprehensive analysis,research,and evaluation for monitoring data on 4 monitoring sections below the body of Gongboxia Hydropower Station 0+214 m diversion tunnel.

Key concepts: Spillway, Hydropower, Section (typography), Water diversion, Environmental science, Hydrology (agriculture), Downstream (manufacturing), Flood myth

Related papers

Back to paper searchBrowse research topicsOriginal source
Analysis and Evaluation on the Diversion Tunnel Monitoring of Gongboxia Hydropower Station — Research Paper | ScholarLens