Analysis and Evaluation on the Diversion Tunnel Monitoring of Gongboxia Hydropower Station
Zhang Xiu-shan
Abstract
Zhang Xiu-shan
Abstract
The blocking of section 0+159 m-I.0+214 m has been implemented one month after the diversion tunnel of Gongboxia Hydropower Station started to impound.However,the downstream of the section 0+214 m has been changed into the right bank of cyclone spillway section under the adit,the swirling flow of holes,water plunge pool and the back water tunnel.So,the security of the sections down the section 0+214 m directly affects flood discharge of the barilleri.This paper will have a comprehensive analysis,research,and evaluation for monitoring data on 4 monitoring sections below the body of Gongboxia Hydropower Station 0+214 m diversion tunnel.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The blocking of section 0+159 m-I.0+214 m has been implemented one month after the diversion tunnel of Gongboxia Hydropower Station started to impound.However,the downstream of the section 0+214 m has been changed into the right bank of cyclone spillway section under the adit,the swirling flow of holes,water plunge pool and the back water tunnel.So,the security of the sections down the section 0+214 m directly affects flood discharge of the barilleri.This paper will have a comprehensive analysis,research,and evaluation for monitoring data on 4 monitoring sections below the body of Gongboxia Hydropower Station 0+214 m diversion tunnel.
Key concepts: Spillway, Hydropower, Section (typography), Water diversion, Environmental science, Hydrology (agriculture), Downstream (manufacturing), Flood myth