2007Oil Drilling & Production TechnologyRequires access

Reservoir protection technology in WZ12-1N oil field development

Zhao We

Open publisher page 0 citations

Abstract

Caving pressure of WZ12-1N oilfield is high while the reservoir liquid has normal pressure gradient.Formation pressure coefficient is less than 1.05 g/cm3 and the drilling fluid used is bigger than 1.3 g/cm3.Two well completion systems of perforation completion and open hole completion were adopted.Because the drilling fluid pressure is higher than that of the reservoir fluid,the drilling fluid will intrude into formation deeply and quantitatively.This would cause reservoir contamination and damage as well as abnormally high flow-back pressure.Measures of properly protecting reservoir,optimizing and choosing appropriate drilling and completion fluid systems were formulated by studying the reservoir nature,sensitivity and special requirements of deviated holes in WZ12-1N oil field for drilling fluids.The goal of drilling fast and excellently was realized and the possible damage in the process of drilling was effectively alleviated.

About this research paper

What this paper is about

Caving pressure of WZ12-1N oilfield is high while the reservoir liquid has normal pressure gradient.Formation pressure coefficient is less than 1.05 g/cm3 and the drilling fluid used is bigger than 1.3 g/cm3.Two well completion systems of perforation completion and open hole completion were adopted.Because the drilling fluid pressure is higher than that of the reservoir fluid,the drilling fluid will intrude into formation deeply and quantitatively.This would cause reservoir contamination and damage as well as abnormally high flow-back pressure.Measures of properly protecting reservoir,optimizing and choosing appropriate drilling and completion fluid systems were formulated by studying the reservoir nature,sensitivity and special requirements of deviated holes in WZ12-1N oil field for drilling fluids.The goal of drilling fast and excellently was realized and the possible damage in the process of drilling was effectively alleviated.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Caving pressure of WZ12-1N oilfield is high while the reservoir liquid has normal pressure gradient.Formation pressure coefficient is less than 1.05 g/cm3 and the drilling fluid used is bigger than 1.3 g/cm3.Two well completion systems of perforation completion and open hole completion were adopted.Because the drilling fluid pressure is higher than that of the reservoir fluid,the drilling fluid will intrude into formation deeply and quantitatively.This would cause reservoir contamination and damage as well as abnormally high flow-back pressure.Measures of properly protecting reservoir,optimizing and choosing appropriate drilling and completion fluid systems were formulated by studying the reservoir nature,sensitivity and special requirements of deviated holes in WZ12-1N oil field for drilling fluids.The goal of drilling fast and excellently was realized and the possible damage in the process of drilling was effectively alleviated.

Key concepts: Petroleum engineering, Completion (oil and gas wells), Drilling fluid, Drilling, Perforation, Oil field, Geology, Underbalanced drilling

Related papers

Back to paper searchBrowse research topicsOriginal source
Reservoir protection technology in WZ12-1N oil field development — Research Paper | ScholarLens