Sub-level caving mining with seam of thickness dirt band
Meng Xian-rui
Abstract
Meng Xian-rui
Abstract
The paper introduces the attempts to subject seam of thickness dirt band to fully-mechanized with sub-level caving in Kailuan Fangezhuang mine depending on site practical data and combining experimentation with theoretical study. By analogue simulating test, the paper discusses fully-mechanized sub-level with dirt band, the top-coal caving and drawing property, the caving procedure and drawing law, and the dirt band critical thickness related to complex structure thickness seam of 2429S. The paper features the rule governing the movement of top-coal with dirt band and the technical measures of sub-level caving mining.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The paper introduces the attempts to subject seam of thickness dirt band to fully-mechanized with sub-level caving in Kailuan Fangezhuang mine depending on site practical data and combining experimentation with theoretical study. By analogue simulating test, the paper discusses fully-mechanized sub-level with dirt band, the top-coal caving and drawing property, the caving procedure and drawing law, and the dirt band critical thickness related to complex structure thickness seam of 2429S. The paper features the rule governing the movement of top-coal with dirt band and the technical measures of sub-level caving mining.
Key concepts: Dirt, Mining engineering, Coal mining, Coal, Geotechnical engineering, Engineering, Geology, Mechanical engineering