The Practice and Understanding about Drilling through High Temperature and High Pressure Intervals in Well DF29-1-6
Zheng Dawei
Abstract
Zheng Dawei
Abstract
The DF29-1-6 is a high temperature and high pressure exploratory well drilled by KANTANⅢwhich is a semi-submersible drilling platform.This well faced two significant challenges during the drilling process,one is high temperature and high pressure, which has great influence on drilling fluid stability.The other is the well control problem because the safety window is very narrow and the formation pressure is close to the fracture pressure.During drilling 212.7 mm(8-3/8) well section which is characterized by high temperature and pressure,lots of measures have been taken,such as meticulous management and operation,optimizing BHA, monitoring closely the drilling parameters,especially the temperature of the drilling fluid back to the wellhead,maintaining good rheology and stability of the drilling fluid under high temperature and high pressure conditions,cementing plug well at the stage of well abandonment and so on,to finish the well drilling safely and excellently.Through this well,KANTANⅢhas obtained rich experiences in the field operation,which can be used in the domestic offshore high temperature and high pressure well drilling.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The DF29-1-6 is a high temperature and high pressure exploratory well drilled by KANTANⅢwhich is a semi-submersible drilling platform.This well faced two significant challenges during the drilling process,one is high temperature and high pressure, which has great influence on drilling fluid stability.The other is the well control problem because the safety window is very narrow and the formation pressure is close to the fracture pressure.During drilling 212.7 mm(8-3/8) well section which is characterized by high temperature and pressure,lots of measures have been taken,such as meticulous management and operation,optimizing BHA, monitoring closely the drilling parameters,especially the temperature of the drilling fluid back to the wellhead,maintaining good rheology and stability of the drilling fluid under high temperature and high pressure conditions,cementing plug well at the stage of well abandonment and so on,to finish the well drilling safely and excellently.Through this well,KANTANⅢhas obtained rich experiences in the field operation,which can be used in the domestic offshore high temperature and high pressure well drilling.
Key concepts: Wellhead, Drilling, Petroleum engineering, Drilling fluid, Underbalanced drilling, High pressure, Lost circulation, Well control