The main bridge of Oujiang Bridge in Wenzhou city,Zhejiang Province is a hybrid girder rigid-frame bridge with span arrangement of(84+200+84)m.The 80m-long midspan section of the intermediate span adopts the steel box girder,the remaining part adopts concrete box girder,and the steel-concrete joint section adopts the form of bearing plate with grilles.To ensure the construction quality,the steel-concrete joint section was vertically placed in the prefabrication process.When the temporary hoisting points were installed and the age of the concrete met the requirements,the steel-concrete joint section was floated to the bridge site by barges.Then,the deck crane was used to turn the steel-concrete joint section,and monolithically hoist and erect the steel-concrete joint section to the design elevation,subsequent to which the joint between the concrete cantilever girder section and the steel-concrete joint section was cast in place.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The main bridge of Oujiang Bridge in Wenzhou city,Zhejiang Province is a hybrid girder rigid-frame bridge with span arrangement of(84+200+84)m.The 80m-long midspan section of the intermediate span adopts the steel box girder,the remaining part adopts concrete box girder,and the steel-concrete joint section adopts the form of bearing plate with grilles.To ensure the construction quality,the steel-concrete joint section was vertically placed in the prefabrication process.When the temporary hoisting points were installed and the age of the concrete met the requirements,the steel-concrete joint section was floated to the bridge site by barges.Then,the deck crane was used to turn the steel-concrete joint section,and monolithically hoist and erect the steel-concrete joint section to the design elevation,subsequent to which the joint between the concrete cantilever girder section and the steel-concrete joint section was cast in place.