Numerical Simulation on Flow Field and Concentration Field of Molten Steel in Slab Continuous Casting Tundish

Yang XuQin

Open publisher page 0 citations

Abstract

Flow field and concentration field of slab continuous casting tundish were simulated with FLUENT software.The flow field and concentration field were analyzed under different conditions of with or without weir and different parameter combinations of dam in tundish.Simulation results show that optimization combination of turbulence inhibitor makes the mean average residence time increase from 502 s to 573 s,the dead zone volume fraction decrease from 29.7% to 14.4%.The parameter optimizing of the dam and weir is favourable for homogenizing temperature and composition of molten steel and removal of inclusions.

About this research paper

What this paper is about

Flow field and concentration field of slab continuous casting tundish were simulated with FLUENT software.The flow field and concentration field were analyzed under different conditions of with or without weir and different parameter combinations of dam in tundish.Simulation results show that optimization combination of turbulence inhibitor makes the mean average residence time increase from 502 s to 573 s,the dead zone volume fraction decrease from 29.7% to 14.4%.The parameter optimizing of the dam and weir is favourable for homogenizing temperature and composition of molten steel and removal of inclusions.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Flow field and concentration field of slab continuous casting tundish were simulated with FLUENT software.The flow field and concentration field were analyzed under different conditions of with or without weir and different parameter combinations of dam in tundish.Simulation results show that optimization combination of turbulence inhibitor makes the mean average residence time increase from 502 s to 573 s,the dead zone volume fraction decrease from 29.7% to 14.4%.The parameter optimizing of the dam and weir is favourable for homogenizing temperature and composition of molten steel and removal of inclusions.

Key concepts: Tundish, Slab, Continuous casting, Water model, Fluent, Mechanics, Turbulence, Metallurgy