2012Coal science and technologyRequires access

Study on Gas Drainage with Large Diameter High Level Borehole to Replace High Level Gas Drainage Gateway

Xiangdong Wang

Open publisher page 1 citations

Abstract

According to the high engineering and high investment problems in a construction of high level gas drainage gateway,an experiment of large diameter high level borehole to replace a high level gas drainage gateway was conducted in No.24207 fully mechanized coal mining face in Shaqu Mine and a comparison and analysis on the gas drainage effects of the two methods was conducted.The gas drainage effect with high level borehole was reached the gas drainage effect with high level gateway.The high level boreholes with a layout of fan could expand the gas drainage scope,could extend the gas drainage service time and could improve the gas drainage rate.The gas volume fraction of the air returning gateway in the coal mining face could be controlled around 0.33%.The application results showed that the large diameter high level borehole was feasible to replace the high level gas drainage gateway for gas drainage.

About this research paper

What this paper is about

According to the high engineering and high investment problems in a construction of high level gas drainage gateway,an experiment of large diameter high level borehole to replace a high level gas drainage gateway was conducted in No.24207 fully mechanized coal mining face in Shaqu Mine and a comparison and analysis on the gas drainage effects of the two methods was conducted.The gas drainage effect with high level borehole was reached the gas drainage effect with high level gateway.The high level boreholes with a layout of fan could expand the gas drainage scope,could extend the gas drainage service time and could improve the gas drainage rate.The gas volume fraction of the air returning gateway in the coal mining face could be controlled around 0.33%.The application results showed that the large diameter high level borehole was feasible to replace the high level gas drainage gateway for gas drainage.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

According to the high engineering and high investment problems in a construction of high level gas drainage gateway,an experiment of large diameter high level borehole to replace a high level gas drainage gateway was conducted in No.24207 fully mechanized coal mining face in Shaqu Mine and a comparison and analysis on the gas drainage effects of the two methods was conducted.The gas drainage effect with high level borehole was reached the gas drainage effect with high level gateway.The high level boreholes with a layout of fan could expand the gas drainage scope,could extend the gas drainage service time and could improve the gas drainage rate.The gas volume fraction of the air returning gateway in the coal mining face could be controlled around 0.33%.The application results showed that the large diameter high level borehole was feasible to replace the high level gas drainage gateway for gas drainage.

Key concepts: Drainage, Borehole, Petroleum engineering, Coal mining, Coal, Geology, Mining engineering, Environmental science

Related papers

Back to paper searchBrowse research topicsOriginal source
Study on Gas Drainage with Large Diameter High Level Borehole to Replace High Level Gas Drainage Gateway — Research Paper | ScholarLens