Numerical Simulation on Interaction between New Foundation Pit and Existing Metro Station

Liu Qingfang

Open publisher page 1 citations

Abstract

The deformation of the retaining structure of the foundation pit of Qianhaiwan Station and that of the main structure of the existing Liyumen Metro Station are analyzed by means of FLAC3D finite element method,so as to minimize the interaction between the foundation pit construction and the existing Metro station.The study results show that the existing Liyumen station is favorable to the excavation of the new foundation pit because it can reduce the deformation of the piles on the same side by 24.7% and can reduce the axial force of the steel supports,which makes the excavation safer;on the other hand,the excavation of the new foundation pit will make the existing station rotate with a small value,which has little effect on the stability and safety of the existing station.

About this research paper

What this paper is about

The deformation of the retaining structure of the foundation pit of Qianhaiwan Station and that of the main structure of the existing Liyumen Metro Station are analyzed by means of FLAC3D finite element method,so as to minimize the interaction between the foundation pit construction and the existing Metro station.The study results show that the existing Liyumen station is favorable to the excavation of the new foundation pit because it can reduce the deformation of the piles on the same side by 24.7% and can reduce the axial force of the steel supports,which makes the excavation safer;on the other hand,the excavation of the new foundation pit will make the existing station rotate with a small value,which has little effect on the stability and safety of the existing station.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The deformation of the retaining structure of the foundation pit of Qianhaiwan Station and that of the main structure of the existing Liyumen Metro Station are analyzed by means of FLAC3D finite element method,so as to minimize the interaction between the foundation pit construction and the existing Metro station.The study results show that the existing Liyumen station is favorable to the excavation of the new foundation pit because it can reduce the deformation of the piles on the same side by 24.7% and can reduce the axial force of the steel supports,which makes the excavation safer;on the other hand,the excavation of the new foundation pit will make the existing station rotate with a small value,which has little effect on the stability and safety of the existing station.

Key concepts: Foundation (evidence), Excavation, Metro station, Engineering, Deformation (meteorology), Subway station, Finite element method, Geotechnical engineering