The application of impact rolling technology in construction of rock-fill dam of Hongjiadu Hydropower Station is the first example in same dam type at home and abroad. Analysis on samples collected at site made known the dry density of subordinate rock-fill body basically come up to the requirement of main rock-fill body, and the dry density of main rock-fill body reach up to more than 2.190 t/m after impact rolling. Application of the technology can not only raise dry density of rock-fill body, but also shorten construction period, reduce deformation of the dam body during operation period.

About this research paper

What this paper is about

The application of impact rolling technology in construction of rock-fill dam of Hongjiadu Hydropower Station is the first example in same dam type at home and abroad. Analysis on samples collected at site made known the dry density of subordinate rock-fill body basically come up to the requirement of main rock-fill body, and the dry density of main rock-fill body reach up to more than 2.190 t/m after impact rolling. Application of the technology can not only raise dry density of rock-fill body, but also shorten construction period, reduce deformation of the dam body during operation period.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The application of impact rolling technology in construction of rock-fill dam of Hongjiadu Hydropower Station is the first example in same dam type at home and abroad. Analysis on samples collected at site made known the dry density of subordinate rock-fill body basically come up to the requirement of main rock-fill body, and the dry density of main rock-fill body reach up to more than 2.190 t/m after impact rolling. Application of the technology can not only raise dry density of rock-fill body, but also shorten construction period, reduce deformation of the dam body during operation period.

Key concepts: Hydropower, Geotechnical engineering, Geology, Mining engineering, Deformation (meteorology), Civil engineering, Engineering, Electrical engineering