Application of Post-grouting on Pile End Technology in Existing Pile Foundation Usage
Wang Liang-dong
Abstract
Wang Liang-dong
Abstract
The key point is to control the differential settlement of new-building and existing pile foundations when using existing pile foundation in new bridge construction.With the specific requirements for the control of pile foundation deformation,post-grouting on pile end technology can be used to improve the stress performance of bored pile.Combined with a practical engineering case,the effects of post-grouting on pile end technology for improving of bearing capacity and reducing of settlement deformation are introduced in the paper.Then,the strengthening mechanism is put forward briefly.Finally,the construction plan and strengthening result are mentioned.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The key point is to control the differential settlement of new-building and existing pile foundations when using existing pile foundation in new bridge construction.With the specific requirements for the control of pile foundation deformation,post-grouting on pile end technology can be used to improve the stress performance of bored pile.Combined with a practical engineering case,the effects of post-grouting on pile end technology for improving of bearing capacity and reducing of settlement deformation are introduced in the paper.Then,the strengthening mechanism is put forward briefly.Finally,the construction plan and strengthening result are mentioned.
Key concepts: Pile, Foundation (evidence), Settlement (finance), Engineering, Bearing capacity, Bridge (graph theory), Geotechnical engineering, Civil engineering