2010China Municipal EngineeringRequires access

Application of Post-grouting on Pile End Technology in Existing Pile Foundation Usage

Wang Liang-dong

Open publisher page 0 citations

Abstract

The key point is to control the differential settlement of new-building and existing pile foundations when using existing pile foundation in new bridge construction.With the specific requirements for the control of pile foundation deformation,post-grouting on pile end technology can be used to improve the stress performance of bored pile.Combined with a practical engineering case,the effects of post-grouting on pile end technology for improving of bearing capacity and reducing of settlement deformation are introduced in the paper.Then,the strengthening mechanism is put forward briefly.Finally,the construction plan and strengthening result are mentioned.

About this research paper

What this paper is about

The key point is to control the differential settlement of new-building and existing pile foundations when using existing pile foundation in new bridge construction.With the specific requirements for the control of pile foundation deformation,post-grouting on pile end technology can be used to improve the stress performance of bored pile.Combined with a practical engineering case,the effects of post-grouting on pile end technology for improving of bearing capacity and reducing of settlement deformation are introduced in the paper.Then,the strengthening mechanism is put forward briefly.Finally,the construction plan and strengthening result are mentioned.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The key point is to control the differential settlement of new-building and existing pile foundations when using existing pile foundation in new bridge construction.With the specific requirements for the control of pile foundation deformation,post-grouting on pile end technology can be used to improve the stress performance of bored pile.Combined with a practical engineering case,the effects of post-grouting on pile end technology for improving of bearing capacity and reducing of settlement deformation are introduced in the paper.Then,the strengthening mechanism is put forward briefly.Finally,the construction plan and strengthening result are mentioned.

Key concepts: Pile, Foundation (evidence), Settlement (finance), Engineering, Bearing capacity, Bridge (graph theory), Geotechnical engineering, Civil engineering