Research on a dynamic tracking model for reservoir water flooding of separated zone water injection

Ke-Li Wu

Open publisher page 0 citations

Abstract

Waterflood is one of the main oil reservoir development ways.Premature flooding of production wells during water flooding process will reduce oil recovery.Therefore,it is particularly important to establish a dynamic tracking model for reservoir water flooding of separated zone water injection.Based on the basic principles of heat and mass transfer,according to well temperature curve to determine the water profile,Poisson process analysis and stochastic process methods are adopted to calculate water saturation,water breakthrough time and water cut of each layer in water flooded reservoir at any one time.When oil reservoir gradually become water flooded,the calculated water cut of model considering micro-pore distribution of the reservoir tends to the measured water cut,and the calculation error is less than 5%.Case study shows that the layer of the higher injection rate,with high flow channel such as micro fracture,where there is the faster increase in water saturation,the shorter water breakthrough time and faster increase in water cut,and vice versa.Research result provides time guarantee to take measures for inhibiting or delaying water breakthrough of production wells.

About this research paper

What this paper is about

Waterflood is one of the main oil reservoir development ways.Premature flooding of production wells during water flooding process will reduce oil recovery.Therefore,it is particularly important to establish a dynamic tracking model for reservoir water flooding of separated zone water injection.Based on the basic principles of heat and mass transfer,according to well temperature curve to determine the water profile,Poisson process analysis and stochastic process methods are adopted to calculate water saturation,water breakthrough time and water cut of each layer in water flooded reservoir at any one time.When oil reservoir gradually become water flooded,the calculated water cut of model considering micro-pore distribution of the reservoir tends to the measured water cut,and the calculation error is less than 5%.Case study shows that the layer of the higher injection rate,with high flow channel such as micro fracture,where there is the faster increase in water saturation,the shorter water breakthrough time and faster increase in water cut,and vice versa.Research result provides time guarantee to take measures for inhibiting or delaying water breakthrough of production wells.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Waterflood is one of the main oil reservoir development ways.Premature flooding of production wells during water flooding process will reduce oil recovery.Therefore,it is particularly important to establish a dynamic tracking model for reservoir water flooding of separated zone water injection.Based on the basic principles of heat and mass transfer,according to well temperature curve to determine the water profile,Poisson process analysis and stochastic process methods are adopted to calculate water saturation,water breakthrough time and water cut of each layer in water flooded reservoir at any one time.When oil reservoir gradually become water flooded,the calculated water cut of model considering micro-pore distribution of the reservoir tends to the measured water cut,and the calculation error is less than 5%.Case study shows that the layer of the higher injection rate,with high flow channel such as micro fracture,where there is the faster increase in water saturation,the shorter water breakthrough time and faster increase in water cut,and vice versa.Research result provides time guarantee to take measures for inhibiting or delaying water breakthrough of production wells.

Key concepts: Water flooding, Petroleum engineering, Water cut, Water injection (oil production), Environmental science, Flooding (psychology), Injection well, Saturation (graph theory)