2013Jianzhu jishuRequires access

APPLICATION OF BIM TECHNOLOGY IN CONSTRUCTION OF LARGE-SCALE LABORATORY AND OFFICE GENERAL BUILDING

Yang Bing-ju

Open publisher page 0 citations

Abstract

China University of Petroleum(Beijing) Laboratory Office General Building project encounters a series of problems,such as complex structure,narrow construction site and crossed pipeline,etc.BIM technology is used to establish tridimentional model and to detect errors on plane drawing Construction technique and general contract management capacity are improved,working efficiency is increased and construction cost is saved through application of BIM technology to establish tridimentional model and to detect errors on plane drawings,optimum distribution and transportation of tower crane and materials on construction site,in-depth design of electromechanical general pipe network,improvement of communication and fast calculation,etc.

About this research paper

What this paper is about

China University of Petroleum(Beijing) Laboratory Office General Building project encounters a series of problems,such as complex structure,narrow construction site and crossed pipeline,etc.BIM technology is used to establish tridimentional model and to detect errors on plane drawing Construction technique and general contract management capacity are improved,working efficiency is increased and construction cost is saved through application of BIM technology to establish tridimentional model and to detect errors on plane drawings,optimum distribution and transportation of tower crane and materials on construction site,in-depth design of electromechanical general pipe network,improvement of communication and fast calculation,etc.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

China University of Petroleum(Beijing) Laboratory Office General Building project encounters a series of problems,such as complex structure,narrow construction site and crossed pipeline,etc.BIM technology is used to establish tridimentional model and to detect errors on plane drawing Construction technique and general contract management capacity are improved,working efficiency is increased and construction cost is saved through application of BIM technology to establish tridimentional model and to detect errors on plane drawings,optimum distribution and transportation of tower crane and materials on construction site,in-depth design of electromechanical general pipe network,improvement of communication and fast calculation,etc.

Key concepts: Beijing, Tower, Engineering, Pipeline (software), Construction engineering, Civil engineering, Building information modeling, Scale (ratio)

Related papers

Back to paper searchBrowse research topicsOriginal source
APPLICATION OF BIM TECHNOLOGY IN CONSTRUCTION OF LARGE-SCALE LABORATORY AND OFFICE GENERAL BUILDING — Research Paper | ScholarLens