Effect of Standing Times on Post-construction Settlement of Clay Loess Subgrade
WU Lian-hai
Abstract
WU Lian-hai
Abstract
Research purposes:The change law of post-construction settlement of one passenger dedicated line's clay loess subgrade without pre-loading is predicted under different standing times with curve fitting method.Research conclusions:From the prediction analysis with curve fitting method it is concluded after excavation or filling of the subgrade,the subgrade settlement is large when the subgrade stands within 4 months,the subgrade settlement tends to slow down when the subgrade stands for 4-6 months and the subgrade settlement tends to stable when the subgrade stands for more than 6 months.Although there is the difference of settlement prediction between using logarithmic curve method and hyperbola method,but the difference can be solved by using the medium value of these two methods to ensure the prediction conforming to the real situation.
OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Research purposes:The change law of post-construction settlement of one passenger dedicated line's clay loess subgrade without pre-loading is predicted under different standing times with curve fitting method.Research conclusions:From the prediction analysis with curve fitting method it is concluded after excavation or filling of the subgrade,the subgrade settlement is large when the subgrade stands within 4 months,the subgrade settlement tends to slow down when the subgrade stands for 4-6 months and the subgrade settlement tends to stable when the subgrade stands for more than 6 months.Although there is the difference of settlement prediction between using logarithmic curve method and hyperbola method,but the difference can be solved by using the medium value of these two methods to ensure the prediction conforming to the real situation.
Key concepts: Subgrade, Hyperbola, Geotechnical engineering, Settlement (finance), Loess, Excavation, Geology, Mathematics