Research purposes:The change law of post-construction settlement of one passenger dedicated line's clay loess subgrade without pre-loading is predicted under different standing times with curve fitting method.Research conclusions:From the prediction analysis with curve fitting method it is concluded after excavation or filling of the subgrade,the subgrade settlement is large when the subgrade stands within 4 months,the subgrade settlement tends to slow down when the subgrade stands for 4-6 months and the subgrade settlement tends to stable when the subgrade stands for more than 6 months.Although there is the difference of settlement prediction between using logarithmic curve method and hyperbola method,but the difference can be solved by using the medium value of these two methods to ensure the prediction conforming to the real situation.

About this research paper

What this paper is about

Research purposes:The change law of post-construction settlement of one passenger dedicated line's clay loess subgrade without pre-loading is predicted under different standing times with curve fitting method.Research conclusions:From the prediction analysis with curve fitting method it is concluded after excavation or filling of the subgrade,the subgrade settlement is large when the subgrade stands within 4 months,the subgrade settlement tends to slow down when the subgrade stands for 4-6 months and the subgrade settlement tends to stable when the subgrade stands for more than 6 months.Although there is the difference of settlement prediction between using logarithmic curve method and hyperbola method,but the difference can be solved by using the medium value of these two methods to ensure the prediction conforming to the real situation.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Research purposes:The change law of post-construction settlement of one passenger dedicated line's clay loess subgrade without pre-loading is predicted under different standing times with curve fitting method.Research conclusions:From the prediction analysis with curve fitting method it is concluded after excavation or filling of the subgrade,the subgrade settlement is large when the subgrade stands within 4 months,the subgrade settlement tends to slow down when the subgrade stands for 4-6 months and the subgrade settlement tends to stable when the subgrade stands for more than 6 months.Although there is the difference of settlement prediction between using logarithmic curve method and hyperbola method,but the difference can be solved by using the medium value of these two methods to ensure the prediction conforming to the real situation.

Key concepts: Subgrade, Hyperbola, Geotechnical engineering, Settlement (finance), Loess, Excavation, Geology, Mathematics