HEAVY REPAIR PRACTICE OF No.3 HOT BALST STOVE OF SHI STEEL
LI Sheng-huai
Abstract
LI Sheng-huai
Abstract
The whole reformation of No.3 hot blast stove of No.2 blast furnace of Shi Steel from Cowper stove to DS top combustion stove is analyzed.It is introduced the preparation before the overhaul of the stove,selection of refractory materials and construction,how to lay down the drying schedule and the key techniques in stove drying.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The whole reformation of No.3 hot blast stove of No.2 blast furnace of Shi Steel from Cowper stove to DS top combustion stove is analyzed.It is introduced the preparation before the overhaul of the stove,selection of refractory materials and construction,how to lay down the drying schedule and the key techniques in stove drying.
Key concepts: Stove, Combustion, Blast furnace, Schedule, Waste management, Environmental science, Engineering, Metallurgy