DCS Retrofit and System Optimization in Phase II of Huaneng Luohuang Power Plant

Ran Qi-yang

Open publisher page 0 citations

Abstract

DCS retrofit for France ALSTOM's 2×360MW sub-critical coal-fired thermal power generating units of Huaneng Luohuang Power Plant is the process that the old ALSPA P320 control systems is replaced by latest OVATION systems of Emerson Control System (Shanghai) Co.,Ltd.,and auxiliary systems for DCS have also been retrofitted.At the same time,the original control system is optimized to improve the performance of control system.

About this research paper

What this paper is about

DCS retrofit for France ALSTOM's 2×360MW sub-critical coal-fired thermal power generating units of Huaneng Luohuang Power Plant is the process that the old ALSPA P320 control systems is replaced by latest OVATION systems of Emerson Control System (Shanghai) Co.,Ltd.,and auxiliary systems for DCS have also been retrofitted.At the same time,the original control system is optimized to improve the performance of control system.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

DCS retrofit for France ALSTOM's 2×360MW sub-critical coal-fired thermal power generating units of Huaneng Luohuang Power Plant is the process that the old ALSPA P320 control systems is replaced by latest OVATION systems of Emerson Control System (Shanghai) Co.,Ltd.,and auxiliary systems for DCS have also been retrofitted.At the same time,the original control system is optimized to improve the performance of control system.

Key concepts: Power station, Engineering, Thermal power station, Control system, System optimization, Process (computing), Coal, Power (physics)

Related papers

Back to paper searchBrowse research topicsOriginal source
DCS Retrofit and System Optimization in Phase II of Huaneng Luohuang Power Plant — Research Paper | ScholarLens