Economic benefits analysis of Huangyuchuan coal preparation plant

Tong Li

Open publisher page 0 citations

Abstract

Huangyuchuan coal preparation plant,as an appendant project to Huangyuchuan coal mine,is oversize and modern,which is in trial operation phase.To improve its economic benefits,considering the raw coal yield,coal type and normal production time,plan eleven preparation schemes,which are washing No.4 coal alone,washing the mixture of No.4 and No.6 coal.According to the cost calculation,adopt the scheme of preparation of sized blended coal.First blend No.4 coal and No.6 coal by the proportion of 4 ∶6,then screen the blended raw coal with 25 mm screen,wash the screen overflow(200 mm to 25 mm) rather than the screen underflow(25 mm to 0),the slime is mixed into commercial coal.

About this research paper

What this paper is about

Huangyuchuan coal preparation plant,as an appendant project to Huangyuchuan coal mine,is oversize and modern,which is in trial operation phase.To improve its economic benefits,considering the raw coal yield,coal type and normal production time,plan eleven preparation schemes,which are washing No.4 coal alone,washing the mixture of No.4 and No.6 coal.According to the cost calculation,adopt the scheme of preparation of sized blended coal.First blend No.4 coal and No.6 coal by the proportion of 4 ∶6,then screen the blended raw coal with 25 mm screen,wash the screen overflow(200 mm to 25 mm) rather than the screen underflow(25 mm to 0),the slime is mixed into commercial coal.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Huangyuchuan coal preparation plant,as an appendant project to Huangyuchuan coal mine,is oversize and modern,which is in trial operation phase.To improve its economic benefits,considering the raw coal yield,coal type and normal production time,plan eleven preparation schemes,which are washing No.4 coal alone,washing the mixture of No.4 and No.6 coal.According to the cost calculation,adopt the scheme of preparation of sized blended coal.First blend No.4 coal and No.6 coal by the proportion of 4 ∶6,then screen the blended raw coal with 25 mm screen,wash the screen overflow(200 mm to 25 mm) rather than the screen underflow(25 mm to 0),the slime is mixed into commercial coal.

Key concepts: Coal, Coal preparation plant, Arithmetic underflow, Waste management, Clean coal, Raw material, Yield (engineering), Environmental science

Related papers

Back to paper searchBrowse research topicsOriginal source
Economic benefits analysis of Huangyuchuan coal preparation plant — Research Paper | ScholarLens