Design on launching nose for incremental launching bridge construction across Ningbo East Station

Cheng Peng

Open publisher page 0 citations

Abstract

During the bridge incremental launching,the launching nose allocation secures a crucial position in reducing girder internal force and increasing the incremental launching span.Pertaining to the incremental launching bridge construction across Ningbo East Station,a launching nose design method is proposed.By establishing the mechanical model on launching nose,the integrated structural analysis is conducted via computer simulation.Accordingly,the maximum stress and deformation of the guide beam and the steel box girder are solved to satisfy the structural loading requirements.Meanwhile,due that the steel box girder and launching nose cannot be stably guided through the temporary pier,a hanger plate in launching nose bottom is adopted.Therein,this approach provides a reference to launching nose design during incremental launching.

About this research paper

What this paper is about

During the bridge incremental launching,the launching nose allocation secures a crucial position in reducing girder internal force and increasing the incremental launching span.Pertaining to the incremental launching bridge construction across Ningbo East Station,a launching nose design method is proposed.By establishing the mechanical model on launching nose,the integrated structural analysis is conducted via computer simulation.Accordingly,the maximum stress and deformation of the guide beam and the steel box girder are solved to satisfy the structural loading requirements.Meanwhile,due that the steel box girder and launching nose cannot be stably guided through the temporary pier,a hanger plate in launching nose bottom is adopted.Therein,this approach provides a reference to launching nose design during incremental launching.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

During the bridge incremental launching,the launching nose allocation secures a crucial position in reducing girder internal force and increasing the incremental launching span.Pertaining to the incremental launching bridge construction across Ningbo East Station,a launching nose design method is proposed.By establishing the mechanical model on launching nose,the integrated structural analysis is conducted via computer simulation.Accordingly,the maximum stress and deformation of the guide beam and the steel box girder are solved to satisfy the structural loading requirements.Meanwhile,due that the steel box girder and launching nose cannot be stably guided through the temporary pier,a hanger plate in launching nose bottom is adopted.Therein,this approach provides a reference to launching nose design during incremental launching.

Key concepts: Engineering, Structural engineering, Bridge (graph theory), Pier, Box girder, Girder, Beam (structure), Position (finance)

Related papers

Back to paper searchBrowse research topicsOriginal source
Design on launching nose for incremental launching bridge construction across Ningbo East Station — Research Paper | ScholarLens