STUDY OF WATER ENERGY DEVELOPMENT BY APPLYING THE REACH OF THE DAM SITE WHOSE HYDROPOWER STATION WAS BUILT
Chaomin Zhang
Abstract
Chaomin Zhang
Abstract
Through the research of the hydropower development scheme by applying the reach of the dam site of Zhouning Hydropower Station of Muyangxi river,how to use the intermediate flow and the water head of the built hydropower station to develop water energy was introduced.It is a new theme of river plan.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Through the research of the hydropower development scheme by applying the reach of the dam site of Zhouning Hydropower Station of Muyangxi river,how to use the intermediate flow and the water head of the built hydropower station to develop water energy was introduced.It is a new theme of river plan.
Key concepts: Hydropower, Hydraulic head, Civil engineering, Environmental science, Plan (archaeology), Small hydro, Head (geology), Development plan