Case Study on Construction Ventilation Mode of No.3 Inclined Shaft Working Lot of Baojiashan Tunnel

Xiao Yuanping

Open publisher page 0 citations

Abstract

The mode of excavation by drill and blast method,rail-bound transportation system in the inclined shaft,trackless transportation system in the main tunnel and working at multiple faces is adopted in No.3 inclined shaft working lot of Baojiashan super-long highway tunnel.The construction ventilation scheme for the working lot is determined by analyzing the actual conditions of the working lot.The scheme is executed in the construction and good ventilation effect has been achieved,which demonstrates that the ventilation scheme adopted is reasonable and feasible.

About this research paper

What this paper is about

The mode of excavation by drill and blast method,rail-bound transportation system in the inclined shaft,trackless transportation system in the main tunnel and working at multiple faces is adopted in No.3 inclined shaft working lot of Baojiashan super-long highway tunnel.The construction ventilation scheme for the working lot is determined by analyzing the actual conditions of the working lot.The scheme is executed in the construction and good ventilation effect has been achieved,which demonstrates that the ventilation scheme adopted is reasonable and feasible.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The mode of excavation by drill and blast method,rail-bound transportation system in the inclined shaft,trackless transportation system in the main tunnel and working at multiple faces is adopted in No.3 inclined shaft working lot of Baojiashan super-long highway tunnel.The construction ventilation scheme for the working lot is determined by analyzing the actual conditions of the working lot.The scheme is executed in the construction and good ventilation effect has been achieved,which demonstrates that the ventilation scheme adopted is reasonable and feasible.

Key concepts: Engineering, Ventilation (architecture), Drill, Excavation, Mode (computer interface), Working environment, Structural engineering, Marine engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Case Study on Construction Ventilation Mode of No.3 Inclined Shaft Working Lot of Baojiashan Tunnel — Research Paper | ScholarLens