Analytic method of graphical evaluation review technique(GERT) network to control bridge construction progress
Wu Zheng Xiao
Abstract
Wu Zheng Xiao
Abstract
The analytic calculation of GERT network was presented by solving moment function and Mason formula to determine the construction procedure parameters. A GERT network model for an example bridge was developed. By this model, the resonable construction time limit was given, and it tollied with actual one.
OpenAlex reports 3 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The analytic calculation of GERT network was presented by solving moment function and Mason formula to determine the construction procedure parameters. A GERT network model for an example bridge was developed. By this model, the resonable construction time limit was given, and it tollied with actual one.
Key concepts: Bridge (graph theory), Moment (physics), Computer science, Limit (mathematics), Function (biology), Control (management), Operations research, Mathematical optimization