Investigation into Water-cone Delay Completion Technique Used in Horizontal Wells of Bottom-water Reservoir in Honghuatao Formation
Sun Xiao-la
Abstract
Sun Xiao-la
Abstract
SH10-P21well is a horizontal well of bottom-water reservoir in Honghuatao Formation in Songzi Oilfield.Its perforation interval is only 20meters deep vertically from oil-water interface.To delay bottom water coning and extend water-free oil production period,the completion technique consisting of variable density perforation,equal acidification as well as pressure-oil control of central oilpipe.It starts a new well completion model and sheds a light on future exploitation of bottom-water reservoir.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
SH10-P21well is a horizontal well of bottom-water reservoir in Honghuatao Formation in Songzi Oilfield.Its perforation interval is only 20meters deep vertically from oil-water interface.To delay bottom water coning and extend water-free oil production period,the completion technique consisting of variable density perforation,equal acidification as well as pressure-oil control of central oilpipe.It starts a new well completion model and sheds a light on future exploitation of bottom-water reservoir.
Key concepts: Completion (oil and gas wells), Bottom water, Petroleum engineering, Perforation, Oil production, Geology, Water injection (oil production), Water cut