2013Journal of Jianghan Petroleum University of Staff and WorkersRequires access

Investigation into Water-cone Delay Completion Technique Used in Horizontal Wells of Bottom-water Reservoir in Honghuatao Formation

Sun Xiao-la

Open publisher page 0 citations

Abstract

SH10-P21well is a horizontal well of bottom-water reservoir in Honghuatao Formation in Songzi Oilfield.Its perforation interval is only 20meters deep vertically from oil-water interface.To delay bottom water coning and extend water-free oil production period,the completion technique consisting of variable density perforation,equal acidification as well as pressure-oil control of central oilpipe.It starts a new well completion model and sheds a light on future exploitation of bottom-water reservoir.

About this research paper

What this paper is about

SH10-P21well is a horizontal well of bottom-water reservoir in Honghuatao Formation in Songzi Oilfield.Its perforation interval is only 20meters deep vertically from oil-water interface.To delay bottom water coning and extend water-free oil production period,the completion technique consisting of variable density perforation,equal acidification as well as pressure-oil control of central oilpipe.It starts a new well completion model and sheds a light on future exploitation of bottom-water reservoir.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

SH10-P21well is a horizontal well of bottom-water reservoir in Honghuatao Formation in Songzi Oilfield.Its perforation interval is only 20meters deep vertically from oil-water interface.To delay bottom water coning and extend water-free oil production period,the completion technique consisting of variable density perforation,equal acidification as well as pressure-oil control of central oilpipe.It starts a new well completion model and sheds a light on future exploitation of bottom-water reservoir.

Key concepts: Completion (oil and gas wells), Bottom water, Petroleum engineering, Perforation, Oil production, Geology, Water injection (oil production), Water cut

Related papers

Back to paper searchBrowse research topicsOriginal source
Investigation into Water-cone Delay Completion Technique Used in Horizontal Wells of Bottom-water Reservoir in Honghuatao Formation — Research Paper | ScholarLens