Grey Decision-Making for Constructional Parameters of Non-Pillar Sublevel Caving in Zhangjiawa Iron Mine
Song Shou-zhi
Abstract
Song Shou-zhi
Abstract
Taking the conditions of the medium ore body of-250?m phase in Zhangjiawa Iron Mine as background,a simulating experiment was carried out with different constructional parameters for non-pillar sublevel caving.Introducing the grey decision-making theory in the optimization of constructional parameters,the problem to transform multi-object optimization including the rates of ore recovery,undiluted ore recovery and rock drop-in into a single-object optimization was successfully solved.According to the experimental results,it was found that such optimum constructional parameters as sublevel height,drift interval and drawing pace are 12.5?m,12?m and 4~5?m,respectively,for the non-pillar sublevel caving of the medium-250?m phase.The investigation provides not only a foundation on which the design of mining preparation is available but also a new approach to the optimization of mining engineering.
OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Taking the conditions of the medium ore body of-250?m phase in Zhangjiawa Iron Mine as background,a simulating experiment was carried out with different constructional parameters for non-pillar sublevel caving.Introducing the grey decision-making theory in the optimization of constructional parameters,the problem to transform multi-object optimization including the rates of ore recovery,undiluted ore recovery and rock drop-in into a single-object optimization was successfully solved.According to the experimental results,it was found that such optimum constructional parameters as sublevel height,drift interval and drawing pace are 12.5?m,12?m and 4~5?m,respectively,for the non-pillar sublevel caving of the medium-250?m phase.The investigation provides not only a foundation on which the design of mining preparation is available but also a new approach to the optimization of mining engineering.
Key concepts: Pillar, Research Object, Engineering, Mining engineering, Foundation (evidence), Structural engineering, Geotechnical engineering, Geology