Cause analysis on over-size of lateral displacement of buttresses No. 3 and No. 12 in Meishan multiple arch dam
Zhou Xiao-xian
Abstract
Zhou Xiao-xian
Abstract
Aiming at the over-size of lateral displacernent of buttress No. 3 and buttress No. 12 in Meishan multi-ple arch dam, on the basis of observation data, the methods such as time-space analysis, numerical model, andstructural calculation were applied to analyze the cause quantitatively from the topography and the structure ofdarn body. It can be concluded that the over-size of lateral displacement of buttress No. 3 and buttress No. 12 isthe results of interaction of temperature load, the topography and the structure of dam body.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Aiming at the over-size of lateral displacernent of buttress No. 3 and buttress No. 12 in Meishan multi-ple arch dam, on the basis of observation data, the methods such as time-space analysis, numerical model, andstructural calculation were applied to analyze the cause quantitatively from the topography and the structure ofdarn body. It can be concluded that the over-size of lateral displacement of buttress No. 3 and buttress No. 12 isthe results of interaction of temperature load, the topography and the structure of dam body.
Key concepts: Buttress, Arch, Geotechnical engineering, Displacement (psychology), Structural engineering, Engineering, Geology, Psychotherapist