2002•Journal of Yangtze River Scientific Research InstituteRequires access

Cause analysis on over-size of lateral displacement of buttresses No. 3 and No. 12 in Meishan multiple arch dam

Zhou Xiao-xian

Open publisher page 0 citations

Abstract

Aiming at the over-size of lateral displacernent of buttress No. 3 and buttress No. 12 in Meishan multi-ple arch dam, on the basis of observation data, the methods such as time-space analysis, numerical model, andstructural calculation were applied to analyze the cause quantitatively from the topography and the structure ofdarn body. It can be concluded that the over-size of lateral displacement of buttress No. 3 and buttress No. 12 isthe results of interaction of temperature load, the topography and the structure of dam body.

About this research paper

What this paper is about

Aiming at the over-size of lateral displacernent of buttress No. 3 and buttress No. 12 in Meishan multi-ple arch dam, on the basis of observation data, the methods such as time-space analysis, numerical model, andstructural calculation were applied to analyze the cause quantitatively from the topography and the structure ofdarn body. It can be concluded that the over-size of lateral displacement of buttress No. 3 and buttress No. 12 isthe results of interaction of temperature load, the topography and the structure of dam body.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Aiming at the over-size of lateral displacernent of buttress No. 3 and buttress No. 12 in Meishan multi-ple arch dam, on the basis of observation data, the methods such as time-space analysis, numerical model, andstructural calculation were applied to analyze the cause quantitatively from the topography and the structure ofdarn body. It can be concluded that the over-size of lateral displacement of buttress No. 3 and buttress No. 12 isthe results of interaction of temperature load, the topography and the structure of dam body.

Key concepts: Buttress, Arch, Geotechnical engineering, Displacement (psychology), Structural engineering, Engineering, Geology, Psychotherapist

Related papers

Back to paper searchBrowse research topicsOriginal source
Cause analysis on over-size of lateral displacement of buttresses No. 3 and No. 12 in Meishan multiple arch dam — Research Paper | ScholarLens