2009•Tianranqi diqiu kexueRequires access

A New Forecasting Method for Production with Changing of Water-cut at the Water Flooding Stage

Cen Fang

Open publisher page 0 citations

Abstract

The factors of production decline are different at the reservoir development stages,and water cut is more influence on the production at the flooding stage.Based on the trend analysis of the product of the three,water-cut,oil-bearing,and cumulative production fluid,we form a new forecasting method of reservoir production at the flooding stage,combining the calculation of reasonable injection-production ratio and the water-cut optimization of the stage.This method supports the development of adjustment for reservoir without numerical simulation in practice.

About this research paper

What this paper is about

The factors of production decline are different at the reservoir development stages,and water cut is more influence on the production at the flooding stage.Based on the trend analysis of the product of the three,water-cut,oil-bearing,and cumulative production fluid,we form a new forecasting method of reservoir production at the flooding stage,combining the calculation of reasonable injection-production ratio and the water-cut optimization of the stage.This method supports the development of adjustment for reservoir without numerical simulation in practice.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The factors of production decline are different at the reservoir development stages,and water cut is more influence on the production at the flooding stage.Based on the trend analysis of the product of the three,water-cut,oil-bearing,and cumulative production fluid,we form a new forecasting method of reservoir production at the flooding stage,combining the calculation of reasonable injection-production ratio and the water-cut optimization of the stage.This method supports the development of adjustment for reservoir without numerical simulation in practice.

Key concepts: Water flooding, Stage (stratigraphy), Water cut, Flooding (psychology), Petroleum engineering, Production (economics), Geology, Environmental science

Related papers

Back to paper searchBrowse research topicsOriginal source
A New Forecasting Method for Production with Changing of Water-cut at the Water Flooding Stage — Research Paper | ScholarLens